Bid/RFP/RFI Date | Project Name | Addendum(s) | Project Value | Project Doc. Link |
---|---|---|---|---|
KSU Agronomy Research and Innovation Center |
KSU_Agronomy_Research_and_Innovation_Center_Program_28e138b97b46b.pdf |
|||
KU 11th & Mississippi project |
Bid/RFP/RFI Date | Project Name | Addendum(s) | Project Value | Project Doc. Link |
---|---|---|---|---|
Ellis Unified School District #388 intends to issue an (RFQ) Request for Qualifications to interested General Contractors for Construction Manager At-Risk services for construction projects which are part of the recently passed $4,550,000 Bond Issue. These projects will include renovations to the Ellis Junior / Senior High School and Washington Elementary School. A formal RFQ will be available on October 20, 2022. Firms interested in receiving a copy of the RFQ shall submit a request, by the close of business, on November 1, 2022, to Janice Wilson, Superintendent of Schools, Ellis USD #388, 1011 Washington St., Ellis, KS 67637. |
NOTICE OF INTENT TO ISSUE AN (RFQ) REQUEST FOR QUALIFICATIONS: Unified School District No. 388 Ellis |
Bid/RFP/RFI Date | Project Name | Addendum(s) | Project Value | Project Doc. Link |
---|---|---|---|---|
Interested Construction Management Firms should submit a Statement of Qualifications to: USD 360 Caldwell Schools Attn: CMAR Services 22 N. Webb St. Caldwell, KS 67022 Information requested is due by Thursday, September 29 at 2:00 pm. |
USD 360 Caldwell - Advertisement for Construction Manager at Risk Delivery Method |
|||
Qualifications must be returned to the District Office no later than 4:00 p.m., October 12, 2022 |
Request for Qualifications: USD 348 Baldwin City Schools 715 Chapel St. Baldwin City KS. 66006 |
Bid/RFP/RFI Date | Project Name | Addendum(s) | Project Value | Project Doc. Link |
---|---|---|---|---|
Bid documents, plans and specifications are available for review at the City of Wamego, (785) 456-9119, Attn. Shanda Jahnke, City Clerk: cityclerk@wamego.org, and at BBN Architects: 228 Poyntz Ave., Manhattan, KS 66502, (785) 776-4912, Attn. Pat Schaub, AIA: pas@bbnarchitects.com or Logan Steiner, AIA ljs@bbnarchitects.com. Plans are available in electronic format. Mandatory pre-bid meeting at the library, 431 Lincoln Ave., 2:00 PM, August 3rd, 2020. Sealed bids are due at the office of the City Clerk, City of Wamego, 430 Lincoln Ave., PO Box 86, Wamego, KS 66547-0086, at 2:00 PM, Wednesday, August 17, at which time the bids will be open/read in the City Commission room. |
WAMEGO PUBLIC LIBRARY ADDITION AND REMODEL |
|||
BIDS RECEIVED UNTIL: 2:00 p.m., August 2, 2022, by Upper Little Arkansas River Watershed Joint District No. 95, PO Box 95, 265 Main Street, Little River, Kansas, 67457, at which time and place bids will be publicly opened and read aloud. |
Invitation to Bid: Upper Little Arkansas River Watershed Joint District No. 95 |
|||
Kansas City Corps of Engineers Industry Call - focus on upcoming work at Harlan County, NE - 11:00AM on July 11 |
Harlan County - NE upcoming work |
Bid/RFP/RFI Date | Project Name | Addendum(s) | Project Value | Project Doc. Link |
---|---|---|---|---|
PHASE I is due June 13th, 2022 by 3:00 pm 7 Hard copies and 1 pdf on a jump drive At the district office located at the high school: 2274 6th Rd, Blue Rapids, KS 66411 |
Public Notice & Request for Qualifications Construction Management at Risk (CMAR) Services USD 498 Valley Heights |
|||
USD 498 Valley Heights received seven proposals for providing Construction Management at Risk services as the Constructor for the upcoming building projects in Blue Rapids / Waterville, Kansas. |
Notice to Contractors Construction Management at Risk (CMAR) Services USD 498 Valley Heights |
Bid/RFP/RFI Date | Project Name | Addendum(s) | Project Value | Project Doc. Link |
---|---|---|---|---|
Sealed bids will be received by the Purchasing Agent of the City of Lincoln/Lancaster County, Nebraska BY ELECTRONIC BID PROCESS until: 12:00 pm, April 8, 2022 for providing the following: Air Park Recreation Center and Williams Branch Library Project Bid No. 22-082 |
City of Lincoln - Air Park Recreation Center |
|||
Pursuant to 75-37,141 et seq, please see the advertisement attached here and published in the Kansas Register on April 7, 2022 for the purpose of obtaining firms interested in providing Design-Build services for the referenced project. |
22-04-05 Kansas Docking State Office Building Reconstruction DB |
ASC-OFPM-Docking-Design-Build-Reconstruction-register-notice-4-7-22.pdf |
||
Associated with potential improvements as identified by the board of education, Nickerson USD 309 is soliciting proposals from interested General Contractors for Construction Manager at Risk services in Nickerson, Kansas. If interested, pleased deliver a response to the District Office, Unified School District 309, 4501 W. 4th Ave., Hutchinson, KS 67501. (Attention Curtis Nightingale, Superintendent), no later than 3:00 PM, April 15, 2022. |
RFQ: Nickerson School District USD 309 |
|||
The deadline for submitting qualifications is 3:00pm, Friday, May 6, 2022. Qualification statements shall be sent to the attention of Superintendent Becca Flowers at 20269 W. Highway 54 Pratt, KS 67124. Questions regarding this submission may be submitted to Superintendent Becca Flowers at bflowers@skylineschools.org or Mike Decker at md@sptarchitecture.com. |
Pratt Skyline USD 438: CMAR PUBLICATION FOR PHASE I OF CMAR SELECTION PROCESS AS REQUIRED BY KANSAS STATUTE K.S. A 64-101. |
Bid/RFP/RFI Date | Project Name | Addendum(s) | Project Value | Project Doc. Link |
---|---|---|---|---|
OWNER will receive sealed bids until 5:00 PM, March 18, 2022, at the office of the City Clerk, 117 E. Rutledge, Yates Center, KS. Bids received after this time will not be accepted. Bids will be opened publicly and read aloud during the City Council meeting on March 21st. |
Yates Center - Box Culvert Construction Advertisement |
|||
A formal RFQ will be available on March 23, 2022. Firms interested in receiving a copy of the RFQ shall submit a written request by the close of business on March 22, 2022 to Director of Operations-Brad Canfield, Mulvane USD 263, 628 E. Mulvane St., Mulvane, KS 67110 or bcanfield@usd263.org. Responses to the RFQ will be due no later than 2:00 p.m. April 13, 2022 to be eligible for further consideration. |
NOTICE OF INTENT TO ISSUE REQUEST FOR QUALIFICATIONS: Mulvane USD 263 |
|||
Issued Date: Wednesday, March 16, 2022 Closing Date: Friday April 1, 2022, 5:00 pm, CDT, Interested parties shall submit an e-mail copy of their proposal to the, Tyson Eslinger, Superintendent of Schools at tyson.eslinger@usd216.org , The e-mail shall be clearly marked, ”Statement of Qualifications to provide Construction Manager at Risk Services”. |
Public Notice & Request for Qualifications for Construction Management at Risk Services - USD 216 Deerfield Schools |
|||
All notifications of interest by Construction Management firms shall be in writing and shall be received by USD 293 on or before 1:00 PM (Central Time), April 7, 2022. Interested parties will be provided a Request for Qualifications after April 11, 2022 |
USD 293 Quinter Board of Education Notice of Intent Construction Manager at Risk (CMr) Services Request for Qualifications (RFQ) |
|||
If interested, please deliver responses to the Office of the Superintendent, USD 263, 628 E. Mulvane St, Mulvane, KS 67110 (attention: Brad Canfield, Director of Operations), no later than 2:00pm, April 23, 2022. |
Mulvane RFQ for CMAR USD 263 |
|||
All notifications of interest by Construction Management firms shall be in writing and shall be received by USD 245 on or before 1:00 PM (Central Time), April 11, 2022. Interested parties will be provided a Request for Qualifications after April 14, 2022. |
USD 245 Southern Coffey County Construction Manager at Risk (CMr) Services Request for Qualifications (RFQ) Notice of Intent |
Bid/RFP/RFI Date | Project Name | Addendum(s) | Project Value | Project Doc. Link |
---|---|---|---|---|
If you would like to comment on our proposed DBE goal, please email lspillers@dbeplans.com or call comments into (817) 609-6004 by 2/17/2022 or on 2/17/2022 dial into (415) 464-6800 beginning at 10:00 AM Central Standard Time and ending at 11:00 AM Central Standard Time with conference code 2180581# for direct interactive communication. |
Public Participation – Requesting Comment on Proposed DBE Goal for Liberal Mid-America Regional Airport for FY 2022-24 |
|||
Pursuant to K.S.A. 75-37,143(d), the State Building Advisory Commission will conduct an in-person public hearing at 9:00 a.m. Wednesday, February 9, 2022, in Suite 1200, 12th floor, Eisenhower State Office Building, 700 SW Harrison St., Topeka, Kansas. |
Department of Administration Office of Facilities and Property Management - Notice of Hearing |
|||
A formal RFQ will be available on February 18, 2022. Firms interested in receiving a copy of the RFQ shall submit a written request by the close of business on March 1, 2022 to Randal Chickadonz, Superintendent of Schools, Rose Hill USD #394, 104 N. Rose Hill Road, Rose Hill, KS 67133. Responses to the RFQ will be due on or before March 8, 2022 to be eligible for further consideration. |
NOTICE OF INTENT TO ISSUE REQUEST FOR QUALIFICATIONS Unified School District No. 394 Rose Hill, 104 N. Rose Hill Road, Rose Hill, KS 67133 |
NOTICE-OF-INTENT-TO-ISSUE-REQUEST-FOR-QUALIFICATIONS-ROSE-HILL-USD-394-AGC-1.pdf |
||
Opportunity to comment on our proposed DBE goal. Please note that your response is strictly VOLUNTARY. Below you will find pertinent information regarding the FY 2022-2024 project(s) for the City of Smith Center, KS/Smith Center Municipal Airport. If you would like to comment on our proposed DBE goal, please email lspillers@dbeplans.com or call comments into (817) 609-6004 by 3/1/2022 or on 3/1/2022 dial into (415) 464-6800 beginning at 10:00 AM Central and ending at 11:00 AM Central with conference code 2180581# for direct interactive communication. |
Public Participation – Requesting Comment on Proposed DBE Goal for Smith Center Municipal Airport for FY 2022-24 |
|||
Opportunity to comment on our proposed DBE goal, please email lspillers@dbeplans.com or call comments into (817) 609-6004 by 3/1/2022 or on 3/1/2022 dial into (415) 464-6800 beginning at 10:00 AM Central and ending at 11:00 AM Central with conference code 2180581# for direct interactive communication. |
Public Participation – Requesting Comment on Proposed DBE Goal for Herington Regional Airport for FY 2022-24 |
Bid/RFP/RFI Date | Project Name | Addendum(s) | Project Value | Project Doc. Link |
---|---|---|---|---|
A formal RFQ will be available on Tuesday, January 4, 2022. Firms interested in submitting an RFQ must be registered with the districts’ purchasing Oracle system. To obtain instructions for registration contact Rachelle Scharnhorst / Administrative Assistant / Operations Division / Wichita, KS USD 259 Email: rscharnhorst@usd259 Responses to the RFQ will be due on or before Monday, January 17, 2022, 12:00pm CST to be eligible for further consideration. |
USD No. 259, Sedgwick County, Request for Qualifications (RFQ) for Construction Manager At-Risk services for East High School Science Wing |
03-NOTICE-OF-INTENT-to-Issue-RFQ-CM-ar-Risk-EAst-High-12-13-2021-004.docx |
Bid/RFP/RFI Date | Project Name | Addendum(s) | Project Value | Project Doc. Link |
---|---|---|---|---|
BIDS DUE DECEMBER 02, 2021 BY COB |
BID NOTICE: PRO-MARK SERVICES INC IS PREPARING A BID AS A GENERAL CONTRACTOR FOR THE FOLLOWING PROJECT: MCCONNELL AFB MACC MCCONNEL AFB, KS |
|||
Hesston USD 460 is seeking to select a Construction Management at Risk (CMAR) company for a potential bond project. The deadline for submitting qualifications is 3:00pm December 10, 2021. Qualification statements shall be sent to the attention of Superintendent Ben Proctor at Hesston USD 460,150 North Ridge Road, Hesston, KS 67062. Questions regarding this submission may be submitted to Superintendent Ben Proctor at Ben.Proctor@usd460.org or Greg Tice at gt@sptarchitecture.com. |
CMAR PUBLICATION FOR PHASE I OF CMAR SELECTION PROCESS AS REQUIRED BY KANSAS STATUTE K.S. A 64-101 |
|||
West Elk USD 282 is seeking to select a Construction Management at Risk (CMAR) company for a bond project. The scope of the project includes a new addition to the existing school of approximately 16 new classrooms. a multi-purpose room and support spaces. The construction cost of the project will be between $8 and $9 million dollars (this does not include other service obligations within the public approved $10.5 million dollar bond authority). Interested companies may submit qualifications to meet the Phase I component of K.S.A. 64-101 and include the following information (A) Similar project experience; (B) experience in this type of delivery system; (C) references from design professionals and owners from previous projects; (D) description of construction manager or general contractor’s project management approach; and (E) bonding capacity. Firms submitting a statement of qualifications shall be capable of providing a public works bond in accordance with K.S.A 60-1111, and amendments thereto, and shall present such evidence of such bonding capacity to the board with their statement or qualifications. If a firm fails to present such evidence, such firm shall be deemed unqualified for selection under this subsection. The deadline for submitting qualifications is 3:00pm December 13, 2021. Qualification statements shall be sent to the attention of Superintendent Martin Burke at 1199 KS-99, Howard, KS 67349. Questions regarding this submission may be submitted to Superintendent Martin Burke at martin.burkesupt@westelk.us and Greg Tice at gt@sptarchitecture.com. |
West Elk USD 282 is seeking to select a Construction Management at Risk (CMAR) company for a bond project. |
Bid/RFP/RFI Date | Project Name | Addendum(s) | Project Value | Project Doc. Link |
---|---|---|---|---|
Closing Date: Monday, October 25, 2021 Closing Time: 2:00 p.m., Local Time, Inman, Kansas |
Request for Statement of Qualification to Provide Construction Management At-Risk Services: Unified School District #448 Inman, Kansas |
|||
Issued Date: October 26, 2021, Closing Date: November 12, 2021, Closing Time: 12:00pm , local time, El Dorado, KS |
USD 387 Altoona-Midway Request for Qualifications Construction Management at Risk (CMR) Services |
Request-for-Qualifications-USD-387-Altoona-Midway-Elementary-School.pdf |
Bid/RFP/RFI Date | Project Name | Addendum(s) | Project Value | Project Doc. Link |
---|---|---|---|---|
A formal RFQ will be available on September 16th, 2021. Firms interested in receiving a copy of the RFQ shall submit a written request by the close of business on September 22nd, 2021 to: Sarah Sipe, Landmark Architects, 1020 N. Main St. Hutchinson, Kansas 67501, sarah@landmarkarchitects.net. Responses to the RFQ will be due on or before 5:00 p.m., September 27th, 2021 to be eligible for further consideration. |
NOTICE OF INTENT TO ISSUE REQUEST FOR QUALIFICATIONS Unified School District No. 332 – West Kingman |
Bid/RFP/RFI Date | Project Name | Addendum(s) | Project Value | Project Doc. Link |
---|---|---|---|---|
Bids for the construction of the 2nd Street & Clint Lightner Stadium Parking Lot Improvements will be received by City of Garden City in person and by mail at the City Administrative Center to “Engineering Services”; 301 N. 8th Street, PO Box 998, Garden City, KS 67846 until 11:00 AM local time on Wednesday July 28th at which time the Bids received will be publicly opened and read. Full bid submittal requirements are in the bidding documents. |
Ad for Bid - Garden City 2nd Street & Clint Lightner Stadium Parking Lot Improvements |
Bid/RFP/RFI Date | Project Name | Addendum(s) | Project Value | Project Doc. Link |
---|---|---|---|---|
USD 475 intends to issue a Request for Qualifications (RFQ) to interested General Contractors for Construction Manager At-Risk services for a recently approved project. This project is for the construction of a new elementary school on Fort Riley. A formal RFQ will be available on June 9, 2021. Firms interested in receiving a copy of the RFQ shall submit a written request by the close of business on June 4, 2021 to David Wild, Chief Operations Officer, USD 475, 123 N. Eisenhower Dr, Junction City, KS 67441 or email to DavidWild@usd475.org. Responses to the RFQ will be due on or before June 24, 2021 at 12:00 p.m. to be eligible for further consideration. |
NOTICE OF INTENT TO ISSUE REQUEST FOR QUALIFICATIONS |
Bid/RFP/RFI Date | Project Name | Addendum(s) | Project Value | Project Doc. Link |
---|---|---|---|---|
A formal RFQ will be available on April 30th, 2021. Firms interested in receiving a copy of the RFQ shall submit a written request by the close of business on April 28th, 2021 to Jay Zehr, Superintendent, USD 371, 103 W Sunnyside Ave., P.O. Box 355 Montezuma, KS 67876 or email to jay@usd371.org Responses to the RFQ will be due on or before May 10th, 2021 at 3:00 p.m. to be eligible for further consideration. |
NOTICE OF INTENT TO ISSUE REQUEST FOR QUALIFICATIONS: UNIFIED SCHOOL DISTRICT 371 |
|||
Please deliver your firm’s qualifications to: Todd Evans‐Superintendent USD 113 Prairie Hills 1619 S. Old Hwy 75 Sabetha, Kansas 66534 Submission Deadline: Monday, May 3, 2021 by 3 p.m. |
Request for Statements of Qualifications for Const:ruction Management At‐Risk Services: Prairie Hills USD 113 |
|||
All notifications of interest by Construction Management firms shall be in writing and shall be received by USD 426 on or before 1:00 PM (Central Time), April 30, 2021. |
Unified School District 426, Pike Valley, Kansas: Construction Manager at Risk Request for Qualifications |
Bid/RFP/RFI Date | Project Name | Addendum(s) | Project Value | Project Doc. Link |
---|---|---|---|---|
Request for Qualifications (RFQ) for Construction Management at Risk (CMAR) services will be received by Twin Valley USD 240 until Noon on April 16, 2021. Request for Qualifications are being requested for the CMAR services described and defined in Kansas statute 64-101 (Advertisement) and 72-6760 (Kansas USD Project Delivery Process). To request a copy of the RFQ, please contact: Pam Irwin, Superintendent Twin Valley USD 240 107 N. Nelson Bennington, KS 67422 |
TWIN VALLEY USD 240 NOTICE FOR CMAR SERVICES |
|||
The deadline for submitting your response will be no later than Monday, April 5, 2021 at 4:00 pm. Proposals received after this date and time will not be considered |
The Unified School District No. 439 Sedgwick Public Schools is accepting request for qualifications for Construction Manager |
|||
Requesting Comment on Proposed DBE Goal for Emporia Municipal Airport for FY 2019-21 |
||||
Requesting Comment on Proposed DBE Goal for Coffeyville Municipal Airport for FY 2019-21 |
The-City-of-Coffeyville-KS-Coffeyville-Municipal-Airport-.pdf |
Bid/RFP/RFI Date | Project Name | Addendum(s) | Project Value | Project Doc. Link |
---|---|---|---|---|
If you would like to comment on our proposed DBE goal, please email lspillers@dbeplans.com or call comments into (817) 609-6004 by 2/17/2021 or on 2/17/2021 dial into (415) 464-6800 beginning at 10:00AM Central and ending at 11:00AM Central with conference code 2180581# for direct interactive communication. Thank you for your assistance. |
Public Participation – Requesting Comment on Proposed DBE Goal for Tribune Municipal Airport for FY 2019-21 |
|||
Sealed Bids for the construction of the Police Department Shooting Range Facility will be received by City of Garden City in person and by mail at the City Administrative Center to “Engineering Services”; 301 N. 8th Street, PO Box 998, Garden City, KS 67846 and electronically at Engineering@gardencityks.us until 11:00 AM local time on Wednesday, March 24, 2021, at which time the Bids received will be publicly opened and via a virtual bid opening hosted as a web meeting and conference call. |
ADVERTISEMENT FOR BIDS: City of Garden City GCPD Shooting Range Facility |
Bid/RFP/RFI Date | Project Name | Addendum(s) | Project Value | Project Doc. Link |
---|---|---|---|---|
January 19, 2021 @ 2:00 PM (Local Time) De Soto USD 232 District Main Office 35200 West 91st Street De Soto, Kansas 66018 (just west of the High School) |
De Soto High School: Performing Arts Center/Classroom Renovation |
Bid/RFP/RFI Date | Project Name | Addendum(s) | Project Value | Project Doc. Link |
---|---|---|---|---|
Sealed Bids for the construction of the Water System Improvements will be received by Owner, at the office of the City Clerk, City of Park; 400 S Elm St.; Park, KS 67751, until 1:00 PM local time on December 9, 2020 at which time the Bids received will be publicly opened and read. Bids received after this time will not be accepted. |
City of Park, Kansas Park, Kansas Water System Improvements – Phase 1 |
ADVERTISEMENT-FOR-BIDS-Park-KS-Water-System-Improvements-Phase-1.pdf |
Bid/RFP/RFI Date | Project Name | Addendum(s) | Project Value | Project Doc. Link |
---|---|---|---|---|
Please deliver one original and 10 copies of your firm’s response to: Dr. Rex Bollinger, District Superintendent Prairie View USD 362 13799 KS HWY 152 La Cygne, KS 66040 Submission Deadline: Thursday, September 10, 2020 at 4 p.m. |
Prairie View USD 362 - Request for Statements of Qualifications for Construction Management at-Risk Services |
|||
Bids for “Campus Drive Pavement Repairs” will be received by City of Garden City in person and by mail at the City Administrative Center to “Engineering Services”; 301 N. 8th Street, PO Box 998, Garden City, KS 67846 and electronically at Engineering@gardencityks.us until 9:00 AM local time on Wednesday, September 9, 2020 |
ADVERTISEMENT FOR BIDS - Bids for “Campus Drive Pavement Repairs” |
Advertisement-for-Bids_PW2007-01-Garden-City-Campus-Drive.pdf |
Bid/RFP/RFI Date | Project Name | Addendum(s) | Project Value | Project Doc. Link |
---|---|---|---|---|
Statement of Qualifications must be received on or before 4:00 pm CST. Thursday August 13, 2020, To GMCN Architects, 115 E. Laurel, Garden City, Kansas 67846. |
USD 467 Wichita County Public Schools - Leoti, KS - Wichita County School Facilities Improvements |
Bid/RFP/RFI Date | Project Name | Addendum(s) | Project Value | Project Doc. Link |
---|---|---|---|---|
Sealed bids for the K- 4 CCLIP Resurfacing Project will be received by OWNER, at the City of Lindsborg City Hall, 101 Main Street, Lindsborg, KS 67456, until 2pm local time on Tuesday, June 23rd, 2020. |
City of Lindsborg:K- 4 CCLIP Resurfacing Project |
City-of-Lindsborg-KS_K-4-CCLIP-Resurfacing-Project_Bid-Advertisement.pdf |
Bid/RFP/RFI Date | Project Name | Addendum(s) | Project Value | Project Doc. Link |
---|---|---|---|---|
Bids shall be delivered to the office of JGR Architects, 730 North Ninth Street, before Thursday, May 14th, 2020 at 2:00 p.m. Bids received after this time will not be accepted. |
Advertisment to bid: Salina Educational Automotive Museum of America |
|||
Sealed Bids for the construction of the Jennie Barker Road and East Side Drainage Improvements will be received by City of Garden City (OWNER) at the Public Works office at 301 N. 8th Street, Garden City, KS 67846, until 11:00 AM local time on Thursday, May 21, 2020, at which time the Bids received will be publicly opened and read. |
Advertisement for Bids: City of Garden City Jennie Barker Road & East Side Drainage Improvements |
ADVERTISEMENT_Jennie-Barker-Rd-East-Side-Drainage-Garden-City-KS.pdf |
||
Bids must be submitted to Titan Built, LLC located at 8207 Melrose Drive, Suite 200, Lenexa, KS 66214 or to bids@titanbuilt.com by no later than 2:00 P.M. Thursday, May 7, 2020. |
INVITATION: TO BID NEW PATTON JUNIOR HIGH SCHOOL |
Bid/RFP/RFI Date | Project Name | Addendum(s) | Project Value | Project Doc. Link |
---|---|---|---|---|
Submittals are due no later than 1:45pm CST, Tuesday, February 4th, 2020. |
Sedgwick County Request for Proposal: Career Development Training Courses |
|||
Submittals are due no later than 1:00 pm MT . Friday, February 7, 2020 |
Greeley County Schools, Board Clerk: CMAR Qualifications |
|||
Submittals are due no later than 2:00 pm on February 21, 2020 |
Humboldt USD 258 RFQ for CMAR |
|||
Submittals are due no later than 2:00 pm on February 20, 2020 |
Columbus USD 493 RFQ for CMAR Services |
|||
OWNER will receive bids until 2:00pm CST, February 5th, 2020, at Clyde City Hall, 412 Clyde, Kansas 66938. Bids received after this time will not be accepted. All interested parties invited to attend. Bids will be opened publicly and read aloud. |
Clyde Swimming Pool and Bath House 145 Perrier St. Clyde, KS 66938 |
Bid/RFP/RFI Date | Project Name | Addendum(s) | Project Value | Project Doc. Link |
---|---|---|---|---|
Sealed Bids for the Construction of the Water Supply System Improvements with be received by ENGINEER at the office of the City Clerk PO Box 46, 511 Hatfield St. Englewood, KS 67840, until 1:30pm local time on January 16, 2020 at which time Bids received will be publicly opened and read. Bids received after this time will not be accepted. |
City of Englewood Water Supply System Improvements |
Englewood-KS-Water-Supply-System-Improvements-Advertisement-for-Bid.._.pdf |
||
Marysville High School Ag Shop, USD 364, 1011 Walnut Street, Marysville, KS |
||||
Marysville High School Ag Shop, USD 364, 1011 Walnut Street, Marysville, KS |
||||
Bid date: January 21, 2020 at 2pm Location: USD 232 District Main Office, 35200 W 91st St, Desoto, KS 66018 Bid Docs: Electronic copies are available for download on Friday, December 27, 2019 at: |
DeSoto USD 232, Owner, and Manning Construction, CM, are requesting bids for the Mill Creek CTE/ECC, District Warehouse, Fieldhouse project |
Bid/RFP/RFI Date | Project Name | Addendum(s) | Project Value | Project Doc. Link |
---|---|---|---|---|
Six copies of the statement of qualifications (plus one electronic copy on a USB flash drive) are to be submitted by December 10, 2019 at 3:00pm CDST to the following: Daryl Stegman - Superintendent USD 381 Spearville Schools 304 East Ave B PO Box 338 Spearville, Kansas 67876 |
Request for Qualifications: Unified School District 381 Spearville, KS |
Bid/RFP/RFI Date | Project Name | Addendum(s) | Project Value | Project Doc. Link |
---|---|---|---|---|
If interested, please deliver response to the Office of the Superintendent, USD 266, 905 W. Academy Ave, Maize, KS 67101 (Attention Richard Bell, Operations Director) no later than 3pm, October 23, 2019. |
Request for Qualifications: Maize School District USD 266 |
|||
Sealed Bids for the construction of the Wastewater System Improvements will be received by OWNER, at the office of the City Clerk, City of Bird City; 111 East 4th St.; Bird City KS 67731, until 10:00 AM local (central) time on October 29, 2019 at which time the Bids received will be publicly opened and read. Bids received after this time will not be accepted. |
City of Bird City Street Improvements |
ADVERTISEMENT-FOR-BIDS_Bird-City-Street-Improvements_LET1.pdf |
||
Statement of Qualification due to the office of Gravity::Works Architecture no later than Tuesday, October 16, 2019, at 12:00pm CT. |
Request for qualifications for USD 375 Circle Public Schools Construction Manager at Risk |
|||
Press Box Re-Roof at Bishop Stadium CICO Park Manhattan, KS |
Bid/RFP/RFI Date | Project Name | Addendum(s) | Project Value | Project Doc. Link |
---|---|---|---|---|
12/12/2017 TIME AND PLACE OF BID OPENING 12:00 pm, February 8, 2018, at the District Office, 5056 E. Highway K4, Gypsum, Kansas. PRE-BID CONFERENCE 3:00 pm, January 25, 2018, at the District Office, 5056 E. Highway K4, Gypsum, Kansas. |
USD 306 Roof Replacement Gypsum, KS |
|||
Market Street Residence Hall - Emporia State University |
||||
12/21/2017 - Sealed Bids for the construction of the Wastewater Lagoon Facility Improvements will be received by OWNER, at the office of 349 Washington Avenue, Long Island, KS 67647, until 1:00 PM local time on January 25, 2018, at which time the Bids received will be publicly opened and read. Bids received after this time will not be accepted |
City of Long Island, Kansas, 349 Washington Ave. Long Island, Kansas 67647 Wastewater Lagoon Facility Improvements - WCI File: 15-600-514-00 |
ADVERTISEMENT-FOR-BIDS-Long-Island-Kansas-Wastewater-Lagoon-Facility-I....pdf |
Bid/RFP/RFI Date | Project Name | Addendum(s) | Project Value | Project Doc. Link |
---|---|---|---|---|
11/04/2017 USD 284 Chase County Schools High School Job Walk |
||||
11/04/2017 Conway Springs, KS - Bid Package 1 - Supply System Improvements City of Conway Springs Conway Springs, Kansas Supply System Improvements WCI File: 12-200-510-02 Bid Package No. 1 |
Conway-Springs-KS_Bid-Package-No.-1_Supply-System-Improvements_Ad.-for-Bid.pdf |
|||
11/04/2017 Conway Springs, KS - Bid Package 2 - Water Treatment Plant City of Conway Springs, Kansas Water Treatment Plant, Bid Package No. 2 |
Conway-Springs-KS_Bid-Package-No.-2_Water-Treatment-Plant_Ad.-for-Bids.pdf |
Bid/RFP/RFI Date | Project Name | Addendum(s) | Project Value | Project Doc. Link |
---|---|---|---|---|
10/16/2017 - City of Norwich, Kansas Water System Improvements KDHE Project No. 2832 CDBG Project No. 17-PF-011 |
Norwich KS_Water System Improvements - Advertisement for Bids |
Norwich-KS_Water-System-Improvements_Advertisement-for-Bids.pdf |
||
10/20/2017 - Bids October 27, 2017 |
Kansas State University Track and Field Renovations |
|||
10/20/2017 - Location: Emporia, KS Job Walk: October 12, 2017 Bid Due: October 26, 2017 |
ESU Market Street Residence Hall |
Bid/RFP/RFI Date | Project Name | Addendum(s) | Project Value | Project Doc. Link |
---|---|---|---|---|
NOTICE-OF-INTENT-TO-ISSUE-REQUEST-FOR-QUALIFICATIONS-ROSE-HILL-USD-394.pdf |
||||
09/07/2017 - RFQ |
USD 394 Rose Hill |
|||
09/08/2017 |
City of Augusta, KS New Garvin Park Buildings PSCHW17100 See attached for bid information |
|||
09/12/2017 - Proposals Due October 2, 2017 at 5:00 p.m. - See attached see attached for additional information. |
USD 447 RFP for architectural services |
Bid/RFP/RFI Date | Project Name | Addendum(s) | Project Value | Project Doc. Link |
---|---|---|---|---|
08/03/2017 - Bid Date: 08/17/2017 Project Location: Lawrence, KS |
Men's Basketball Office Trophy Case - Lawrence, KS |
|||
08/03/2017 |
Remodel Men's Basketball Clubhouse - Lawrence, KS |